This is a heavy machine gun position with shelter during construction. The fire position has a sandwich construction - the interval is filled by crushed stone and gives a reinforced splinter-proof protection. Between the fire position and the shelter there are placed a creeping tube.
Farthest off we see the shelter (diameter=2,2m) witch has an emergency exit at the other side. On the picture there are used a PVC-foil for additional tightening.
The construction hole is drained and the whole construction is going to be surrounded by draining soil. A stone-/concrete jacket is going to cover the shelter. |
 |
 |
 |
 | |
|
 |
 |
 |
 |
| Mounting - and delivery info: |
|
|
|
| Mounting |
: |
Fire position, partially buried |
| Mounting time |
: |
16 hours, excl. digging and embankment |
| Finishing treatment |
: |
Camouflage works and paint |
|
|
|
| Number of parts |
: |
26 |
| Weight |
: |
< 2500 kg |
| Transport frm factory |
: |
3 truckloads of dirt + extra filling | |
 |
 |
 |
 | |
|
| | |